Monochromator shielding
Laue-Langevin Institut, France (10/05/2023- 4/10/2023)
Carbon steel shielding manufactured according to EN 1090 EXC3. First part: 250 tons
Neutron Source Facility, Germany (28/07/2023-12/03/2024)
Carbon steel shielding manufactured according to EN 1090 EXC3. Second part: 250 tons
Neutron Source Facility, Germany (28/07/2023- 12/03/2024)
Carbon steel shielding manufactured according to EN 1090 EXC3
Neutron Source Facility, Germany (22/05/2024-25/10/2024)
Aluminum detector support
Institut Laue–Langevin (ILL), France (10/13/2017 - 12/04/2017)
Carbon steel radiological shielding
Institut Laue–Langevin (ILL), France (05/25/2021 - 11/04/2021)
Carbon steel radiological shielding
Institut Laue–Langevin (ILL), France (10/25/2019 - 01/27/2020)
Aluminum vacuum vessel
ISIS Neutron and Muon Source, UK (01/26/2018 - 04/24/2018)
Shutter storage flasks
ISIS Neutron and Muon Source, UK (02/14/2020 - 06/25/2020)
Shutter storage flasks
ISIS Neutron and Muon Source, UK (06/01/2017 - 09/28/2017)